Designed for manufacture. Engineered for assembly. South Africa · DfMA · Modular · Off-site
START A PROJECT

Bring us into the project before the design is locked.

Tell us what you are planning. We will use the brief to determine the right DfMA, modular, panelised or hybrid starting point.

Project intake

Useful information includes building type, location, scale, target programme, drawings or models, repetition, site access and the performance outcomes that matter most.

01

Initial review

We assess DfMA potential, system strategy and information gaps.

02

Concept workshop

We align architecture, engineering, manufacture, logistics and assembly.

Build smarter from the beginning.

Find a productised building, configure your requirement or bring FlexiBuild into an existing project.

Configure a building →